News

Coupe Line have been out Car Park Patching in a local major retail park....removing existing material with the Bobcat...

 

Preparing the surface and joints......

 

...and finally re-instating new surfacing material ......Job done.....

 

 

 The Coupe Line Team went to Barnard Castle recently and can be seen in the picture below refreshing junction markings and anti-skid areas

 

Oxclose Primary School, Durham now has some new and refreshed parking bays and disabled bays thanks to the Coupe Line Team. For road markings, pothole repairs or new surfacing across the North East including Newcastle, Gateshead, Teesside and the UK, feel free to call Coupe Line on 01388 774040.

 

The Park and Ride in Durham had new parking bays, disabled bays and electric vehicle bays installed in thermoplastic by Coupe Line. The works highlight the areas for parking which will ease congestion.

 

 

An opportunity has arisen for someone to join the H2-GO team.

Hydroblast Operative to work in the road marking industry

Salary – Competitive

We are seeking a HGV Class Two or above qualified driver with sound mechanical knowledge to operate a revolutionary road marking removal machine to work throughout the UK.
The job would require a frequent mixture of dayshift, nightshift and weekend working on a nationwide basis from our Shildon, County Durham depot.
Good communication skills and the ability to problem solve using your own initiative are essential. Previous experience of highway works and a valid CSCS card would be advantageous.

Closing date for applications: 4:30pm on Wednesday, 30th November, 2016.
Please apply in writing enclosing a full CV and covering letter to:

Martin Coupe
Jack Coupe & Sons Ltd
Hackworth Industrial Park
Shildon
County Durham
DL4 1HG
Tel: 01388 774040
E-mail: info@jackcoupeandsonsltd.co.uk

Strictly no job agencies.

 

Coupe Line, Coupe Line Southern, H2-GO and Shildon Thermoplastic can be found at the #ERIC2016 event in Leeds. For more information on our products and service, come and meet one of our friendly team members.

 

At Warden Law, Sunderland, Karting North East has had red high friction surfacing to prevent accidents and yellow lining to form bays and double yellow lining.

 

 

New playground markings including snakes and ladders, alphabet jump, twister, a 4 way hop scotch, a maze and a netball court were installed at North Park Primary School. The netball court was installed using a white epoxy paint and the blue for the maze. The other playground markings used a pre-form material that was bonded to the surface. The markings are bright and colourful and are long lasting.

 

The white lining including speed roundels, arrows, hatching, centre lines and junctions as well as high friction anti-skid were installed at Graham way, Seaham. The long lasting thermoplastic material and bright red anti-skid high friction surfacing helps in preventing road traffic accidents and helps to reduce injuries and fatalities.

 

The colourful and durable red high friction anti-skid surfacing the A693, beamish to Stanley will help to enhance road safety to help prevent road traffic accidents. The white lining crew installed centre and edge line in a professional and safe manner for all road users. For more information on white lining, antiskid or any other road markings please feel free to contact us on 01388774040.

 

 

 

Coupe Line were at Woodham Burn Community Primary School installing parking bays in white thermoplastic and school keep clear markings in yellow. This will ease congestion and help make the parking around the school safer for everyone.

 

 

Coupe Line have been at the Red car park at the metro centre, Gateshead. We have laid white and yellow thermoplastic lines to create parking bays, pedestrian crossing, zebra crossings, junctions, lettering and arrows. This will improve road safety and ease congestion

 

 

Some more pictures of when Coupe Line were at the Nissan Port of Tyne, Car Terminal. The work involved removing markings by scabbling with our bobcat Satan and installing new loading sections and lettering in yellow, white lining and continuous red lining in thermoplastic.

 

 

 

Coupe Line were at the Nissan Port of Tyne Car Terminal. The work involved removing markings by scabbling with our bobcat Satan and installing new loading sections and lettering in yellow, white lining and continuous red lining in thermoplastic.

 

Coupe Line were at Burnhope, Lanchester area in Maiden law installing road markings in thermoplastic material to a tarmac surface. The works consisted of white centre line and continuous edge lines as well as SLOW lettering to improve road safety.

 

 

Coupe Line were installing ‪‎whitelining‬ and road markings at Silverlink Retail Park, Wallsend. The work consisted of parking bays, arrows, junctions and centre lines all in a white thermoplastic applied to a tarmac surface. Coupe Line do works across the UK including areas such as ‪‎Newcastle‬, ‪Sunderland‬, ‪London‬ and ‪‎Hampshire

 

 

Coupe Line were at the beautiful Ramside Hall Hotel, Golf & Spa in Carrville , Durham completing lining work to a new tarmac surface. The works included a new pedestrian crossing, “SLOW” lettering, double yellow lines and centre line in both white and yellow thermoplastic to further increase road safety.

 

 

Coupe Line’s lining team were at Catterick British Army Garrison installing a new brake testing area. Works entailed lettering to the area, Specific lining measurements for testing alongside a centre line and stop line within the testing zone. The works were accomplished on time in yellow and white thermoplastic and to the client’s specifications.

 

 

 

Coupe Line have completed what must be the most intricate acrylic paint work we have lined for some time. The super imposing of various courts on top of each other maximises the available space whilst the colours allow students to play the relevant sport. These courts were carried out in the Shotley Bridge area of County Durham, please feel free to contact Coupe Line on 01388 774040.

Coupe Line installed primrose NO EXIT and yellow hatching in thermoplastic at Hexham General hospital today in the MRI departments car park. For a free quote or further information just let us know on 02392429908 for Coupe Line Southern or 01388774040 for Coupe Line

 

Coupe Line are proud to have installed 8,200m of double yellow thermoplastic lining in a space of only four hours with our brand new state of the art Borum extrusion lining machine. The work will ease parking related congestion at the entrance to Eleven Arches (Flatts Farm, Toronto, Bishop Auckland) in preparation for the forthcoming Kynren event, an outdoor, live action, epic tale of England. For high quality road markings installed by a highly experienced and qualified team members, please call Coupe Line on 01388 774040 for a free quotation.

Coupe Line offer road marking services across the North East featuring Stockton, Team Valley, Darlington and numerous locations on the south coast and south east such as Bournemouth, Hampshire and London.

 

Meet Coupe Line's new addition to the team, Satan the Bobcat. Sporting the Coupe Line colours and ready to start. Coupe Line conduct cats eye installation and removal, white lining and lining removal in the Gateshead, Stockton, Sunderland and the rest of the UK. For a free quotation from our friendly staff please call 01388774040 and enjoy the bank holiday!!

 

 

 

Coupe Line carried out double yellow lining at High Force. The new yellow lining has been formed using high performance yellow thermoplastic materials specifically designed to be durable and long lasting. We carry out work across the UK, please call 01388774040 for any further information.

Coupe Line have installed a new zebra crossing marking on Victoria Road, Consett, County Durham for a recently resurfaced road. The new white lining and road markings have been formed using high performance white thermoplastic materials specifically designed for highway use. Please call 01388774040 for any further information.

 

 

Red high friction anti skid surfacing replaced by Coupe Line's qualified experienced team based in County Durham and Hampshire. We are able to recover existing high friction anti skid surfacing across all the North East regions from Alnwick to York, including Newcastle, Sunderland, Washington and Stockton. Please call 01388774040 for any further information.

 

 

Jack Coupe and Sons Ltd are proud to advertise for letting 2 brand new industrial units based in Shildon, County Durham. The 2 units are 2500 ft2 each and have polished concrete floors with all services ready connected. They share their own large yard space and gated entrance. Please contact our office on 01388774040 for all enquiries

 

 

Millie Rose in the Coupe Line colours is a new addition to the fleet, with added social media logos so people will know to find us on Facebook, Google + and Instagram.

 

 

 

 

Coupe Line at Hathaway roofing, Bishop Auckland, County Durham installing new parking bays and disabled parking bays in white and yellow thermoplastic as well as lettering, hatching and arrows.

 

 

 

Coupe Line's head of marketing and business development visits Hong Kong and notices some very different road markings to ours in the UK Hampshire and County Durham.

 

An update on the A690 Gilesgate, working through the night at Durham City the road markings, featuring lettering and arrows, white MMA and thermoplastic are complete

 

 

Coupe Line have received a certificate from the BBA showing that we have been accepted as an approved installer for the BBA HAPAS High Friction Surfacing System. 

 

 

Our team worked day and night on the A690 Gilesgate, Durham City new road markings in MMA white and thermoplastic by Coupe Line for Durham County Council.

 

 

Another successful scheme carried out by Coupe Line for Lumsden & Carroll who have built a brand new roundabout on the A693 Pelton for Durham County Council, Coupe Line worked through the night under very difficult weather conditions to complete the lining works to the main road including the white lining, high friction red and 301 inset road studs.

 

Newly laid road markings for Durham County Council at the Sands by Coupe Line, the markings consisted of new double yellow no parking lines and on street parking bays with junctions and slow lettering.

 

Coupe Line have installed new parking bays, yellow cross hatched markings and sports court markings at Front Street Primary school, Whickham, Gateshead. Our professional marking crew have installed yellow disabled parking and white parking bays with precision for the school. Below is an outstanding example of no parking using cross hatch markings, showing the expert skills and accuracy provided by Coupe Line.

Coupe Line have concluded several overlaid sports courts including a red basketball court, white football court, orange netball court and a blue tennis court.  The courts each use a quality anti slip traffic paint to maximize health and safety. Our highly qualified team strives to ensure a reliable, high quality service while maintaining cost effectiveness.

 

New Aldi store at Billingham, Stockton new lining works for parking bays, disabled bays and parent and child parking bays in white thermoplastic screed by Coupe Line from Durham.

 

Brand new white road markings laid recently to newly resurfaced road in South Shields, Coupe Line's experienced NVQ trained team successfully laid new centre and edge markings along with speed roundels, junctions and road markings for South Tyneside Council.

 

Coupe Line have taken delivery of their new brand new bobcat S550 which we will use for road stud removal and line removal throughout the UK, pictures show the machine on its maiden site removing old road studs for Durham County Council near Bishop Auckland.

 

Brand new VW Crafter maintenance and breakdown vehicle delivered this week for Coupe Line's skilled repair and service team, pictured here at our depot at Shildon

Road marking in white and yellow thermoplastic at Spectrum Brands Washington Tyne & Wear by Coupe Line including speed humps and road signs.

 

Coupe Line Durham and Portsmouth, the nations leading road marking contractor are proud to announce the award of another health, safety and environmental standard from PICS Auditing. This certificate is in addition to our currently held national and international recognised accreditations and standards and again proves that Coupe Line are committed to the delivery of quality road marking services.

 

Coupe Line have installed school cycle way markings and car park road markings using lettering, white lining and a yellow disabled bay, Bishop Auckland, County Durham

 

 

 

New white safety edge line to highlight the quay for Port of Tyne, North Shields by Coupe Line

Shildon Thermoplastics's new pallet wrapping and weighing machine has been delivered and installed today at our production factory in Shildon. The new wrapper will ensure that all pallets are evenly and securely package ready for transportation across the uk.

 

 

Road marking works to newly surfaced road in Wolsingham, County Durham by Coupe Line, using high performance white and yellow thermoplastic road marking materials.

 

Coupe Line created a new bus stop marking for Durham County Council using white and yellow roadmarkings and yellow lettering.

 

New white road markings and yellow pedestrian walkway thermoplastic for Travis Perkins, Middlesbrough, Teeside by Coupe Line's team, Durham.

 

Coupe Line unable to lay road markings today in parts of County Durham due to snow covered roads following the current cold spell

 

Latest KEEP CLEAR road markings in white laid recently in Durham County by Coupe Line.

 

Coupe Line have succesfully completed a major new lining scheme after our sister company Coupe have reconstructed the Blue Car Park at the Metro Centre, Gateshead. We have used white, yellow and red thermoplastic to transform the car park ready for Black Friday. The car park has been handed over on time to a delighted client.

 

 

 

Coupe Line install new gateway markings in County Durham using red high friction surfacing with white and yellow road markings.

 

Drone camera footage of our Shildon site, showing our existing manufacturing site and our brand new 10,000ft2 workshop and storage facility building which is nearing completion.

 

Coupe Line's latest car park lining works using rubber chlorinated white paint to refresh mixed surface carpark.

 

Coupe Line complete extensive lining to the new A690 interchange with the A19 for Sunderland City Council.

 

Coupe Line workshop nearling completion.

New workshop and storage unit are now entering the final stage of build, concrete floors and services to complete.

 

COUPE LINE'S NEW WORKSHOP

Our new workshop and vehicle storage area is nearly complete, new roller shutter doors and flooring to go.

 

COUPE LINE REACHES NEW HEIGHTS

Coupe Line has successfully completed a major relining program for Perth & Kinross Council, installing new white road markings on the A93 up to the summit of Glenshee.

Coupe Line white line the A93 to Glenshee for Perth & Kinross

 

 

Coupe Line's latest new screed road marking truck hits the road, able to carry out all types of road marking screed works in various colours.

New screed road marking truck Coupe Line

 

Coupe Line have completed high friction surfacing works for Hartlepool Council on the A689, on time and within budget.

 

Coupe Line's new Borum Extrusion machine completes its first lining contract today for Durham County Council, the machine delivered from the NEC traffex show has been a welcome asset and will provide new lining safely and far quicker than previous.

 

Coupe Line are carrying out extensive road marking and high friction surfacing for Durham County Council at junction 63 of the A1(m). The white lining works are following the extensive resurfacing of the entire junction and include grey and buff Type 1 high friction surfacing.

 

For a free quotation, competitive pricing, a proven track record of deadline completion and guaranteed work, please email us details of your enquiry or call us today on 01388 774040.

Accreditations