Case Studies

For a free quotation, competitive pricing, a proven track record of deadline completion and guaranteed work, please email us details of your enquiry or call us today on 01388 774040.

Case: North Park Primary School

Aim:

To install playground markings using paint or pre-form material.

Objective

To complete the works to the best standard for the client and pupils of North Park Primary School.

How We Did It:

Using a "pram" to install the paint works and using a lance to burn the pre form material to bond the material to the surface.

Results

The markings were installed and look bright and vibrant.

Case: Eleven Arches (Flatts Farm, Toronto, Bishop Auckland)

Aim:

To install double yellow lining.

Objective

To complete the works in preparation for the forthcoming Kynren event, an outdoor, live action, epic tale of England.

How We Did It:

With our brand new state of the art Borum extrusion lining machine.

Results

Installing 8,200m of double yellow thermoplastic lining in a space of only four hours.

Case: Victoria Road, Consett, County Durham

Aim:

To form a new Zebra crossing.

Objective

To complete the works on time and in a professional manner.

How We Did It:

Using high performance white thermoplastic and teamwork.

Results

The completion of the Zebra crossing leaving a very happy customer.

Case: Roundabout on the A693 Pelton

Aim:

To complete the lining works to the main road

Objective

To use white lining, high friction red and 301 inset road studs.

How We Did It:

Coupe Line worked through the night under very difficult weather conditions to complete the roundabout built by Lumsden & Carroll for Durham County Council.

Results

The main road was complete and on time despite the weather conditions as shown below.

Case: Front Street Primary School

Aim:

To create brand new car park markings and multiuse sports court for Front Street Primary School in Whickham, Gateshead.

Objective

To create parking bays using white lining, disabled bays and crosshatch no parking area alongside several multicolour, multiuse overlaid sports courts.

How We Did It:

Coupe Line created several overlaid sports courts including a red basketball court, white football court, orange netball court and a blue tennis court.  The courts each use a quality anti slip traffic paint to maximize health and safety. Our professional marking crew have installed yellow disabled parking and white parking bays with precision for the school.

Results

The following images are what our team achieved. Our highly qualified team strives to ensure a reliable, high quality service while maintaining cost effectiveness.

Case: Aldi store at Billingham, Stockton

Aim:

To lay new lining works

Objective

To place parking bays, disabled bays and parent and child parking bays

How We Did It:

Using a white thermoplastic screed that allowed the creation of the parking bays, disabled bays and parent and child parking bays.

Results

The following images are what our team achieved. The new car park is now open and available for use.

Case: Blue car park Metrocentre, Gateshead

Aim:

To reline the resurfaced car park 

Objective

To create use red, white and yellow thermoplastic lines to create the car park

How We Did It:

Coupe Line relined the car park using white thermoplastic to create the parking bays, single and double headed arrows, junctions and lettering. Yellow thermoplastic was used for disabled bays and no parking cross hatching while the red thermoplastic was used for double lining.

Results

The following images are what our team achieved. The new car park is now open and available for use.