For a free quotation, competitive pricing, a proven track record of deadline completion and guaranteed work, please email us details of your enquiry or call us today on 01388 774040.
To install playground markings using paint or pre-form material.
To complete the works to the best standard for the client and pupils of North Park Primary School.
Using a "pram" to install the paint works and using a lance to burn the pre form material to bond the material to the surface.
The markings were installed and look bright and vibrant.
To install double yellow lining.
To complete the works in preparation for the forthcoming Kynren event, an outdoor, live action, epic tale of England.
With our brand new state of the art Borum extrusion lining machine.
Installing 8,200m of double yellow thermoplastic lining in a space of only four hours.
To form a new Zebra crossing.
To complete the works on time and in a professional manner.
Using high performance white thermoplastic and teamwork.
The completion of the Zebra crossing leaving a very happy customer.
To complete the lining works to the main road
To use white lining, high friction red and 301 inset road studs.
Coupe Line worked through the night under very difficult weather conditions to complete the roundabout built by Lumsden & Carroll for Durham County Council.
The main road was complete and on time despite the weather conditions as shown below.
To create brand new car park markings and multiuse sports court for Front Street Primary School in Whickham, Gateshead.
To create parking bays using white lining, disabled bays and crosshatch no parking area alongside several multicolour, multiuse overlaid sports courts.
Coupe Line created several overlaid sports courts including a red basketball court, white football court, orange netball court and a blue tennis court. The courts each use a quality anti slip traffic paint to maximize health and safety. Our professional marking crew have installed yellow disabled parking and white parking bays with precision for the school.
The following images are what our team achieved. Our highly qualified team strives to ensure a reliable, high quality service while maintaining cost effectiveness.
To lay new lining works
To place parking bays, disabled bays and parent and child parking bays
Using a white thermoplastic screed that allowed the creation of the parking bays, disabled bays and parent and child parking bays.
The following images are what our team achieved. The new car park is now open and available for use.
To reline the resurfaced car park
To create use red, white and yellow thermoplastic lines to create the car park
Coupe Line relined the car park using white thermoplastic to create the parking bays, single and double headed arrows, junctions and lettering. Yellow thermoplastic was used for disabled bays and no parking cross hatching while the red thermoplastic was used for double lining.
The following images are what our team achieved. The new car park is now open and available for use.